Town Hall Building, Lalín (project stage)
Mansilla + Tuñón- Typologies Institutional Town Hall / City Hall / Government
- Date 2004
- City Lalín
- Country Spain
- Photographer Luis Asín
The proposal for the Lalín Town Hall moves between precision and probability, building an antimonumental structure in which, as with clouds, each one can recognize the changing forms starting from personal references, so that collective identification – one of the main objectives of architecture when it deals with public spaces and buildings – occurs thanks to the diversity of personal interpretations: it is a ‘technological fortress’, color clouds, a civic palimpsest, a textile pattern, etcetera. The design proposes an open structure, almost a mathematical field that establishes behavior systems and underscores the dialogue with the environment instead of an indifferent autism, choosing a scattered scheme rather than a compact one, transparency rather than opacity, blurred instead of limited boundaries. The idea, all in all, is to generate a non-hierarchical structure in both architectural and social terms. The complex adapts its staggered section to a sloping site. The floor plan is conceived as a group of circular forms of different sizes that surround a public plaza from which one accesses the complementary facilities on one side – radio, multipurpose hall, kindergarten, post office, bank – and the Town Hall premises proper on the other. Inside, the different rooms are inscribed within reinforced concrete cylinders, among which emerges a free-flowing communication space. On ground floor, and around the central lobby, are the areas assigned to the different political groups, a section for citizen services and a police station. The first floor, which is reached through a large circular staircase, is presided by the main assembly hall, tucked into a clearing amid cylinders, and whose presence is physically and symbolically marked, and topped, by a five-story tower containing offices. In terms of construction, the project makes an intensive use of reinforced concrete – present in solid slabs, parts of the facades, circular pillars, retaining walls and screens – and of glass, which is used in different forms depending on its location in the project: transparent, translucent, semi-translucid, transparent soft green, opaque dark green and transparent dark green. The frames are aluminum profiles, placed on a structure of galvanized steel that is anchored to the reinforced concrete. The result is a mosaic of different tones and intensities, which permits different levels of interaction among users, the building and its context.
Cliente Client
Concello de Lalín
Arquitectos Architects
Luis M. Mansilla, Emilio Tuñón
Colaboradores Collaborators
Andrés Regueiro, Luis Díaz-Mauriño, Anna Partenheimer, Carlos Martínez de Albornoz (concurso competition); Andrés Regueiro, Matilde Peralta, María Langarita, Ana del Arenal, Asa Nakano, Bárbara Silva, Carlos Brage, Elke Gmyrek, Ruben Arend, Sara Murado, Bryony Roberts, Carlos Cerezo (proyecto project); Sancho Páramo (aparejador quantity surveyor)
Consultores Consultants
Alfonso Gómez Gaite (estructuras structural engineering); Quicler-López ingenieros (instalaciones mechanical engineering)
Contratista Contractor
FCC Construcción
Fotos Photos
Luis Asín