The Royal Shipyards of Seville are the city’s most impressive civil construction. They are located in a privileged spot: in the Arenal neighborhood, midway between the river and the monumental site of the Cathedral, the Archive of the Indies, and the Alcázar. Dos de Mayo street, parallel to the royal sheds, runs from the Guadalquivir towards the Postigo del Aceite. To one side, the Atarazanas and, in the background, the Cathedral and the Giralda to wrap up the view.

The studio of Guillermo Vázquez Consuegra considers the building as a layering of historical strata, the natural result of the sum of different cultures in one same place. The proposal seeks to address the cultural program in the spaces available on the upper levels of the building, in order to keep the ground floor space intact and, in parallel, open up this magnificent place to the city through the facade to the aforementioned Dos de Mayo street, intensifying the relationship between the historic center and the city...[+]


Reales Atarazanas de Sevilla
Royal Shipyards in Seville

Centro Cultural CaixaForum
Concurso 2009; proyecto básico y de ejecución 2011-2012

Centro Cultural Atarazanas
Proyecto básico y de ejecución 2015-2016, 2019, 2021 

ClienteClient
Fundación Caixa D’Estalvis i Pensions de Barcelona “La Caixa”

ArquitectoArchitect
Guillermo Vázquez Consuegra

ColaboradoresCollaborators
M. Vázquez Consuegra, I. González Ruiz (arquitectos técnicos quantity surveyors); A. Jedrus, J. J. Baena, (coordinadores del concurso competition managers); F. Pambianco, D. Olivieri, M. Jovanovic, M. Wadlewska, L. Magagni, K. Solaun, P. Hébil, N. P. Veint, J. Alves, K. González (concurso competition team);
J. J. Baena (coordinador project manager); A. Jedrus, A. Luna, A. Nicholls, K. Solaun, M. Silvianes, R. Ruiz Montero, E. Melero, E. L. Ariza, C. Beraldin, M. Juliana, D. Olivieri, M. E. Badiali, A. Brunello, P. Fraile, D. Quagliata, M. Juliana, J. Moreno, A. Labaut, G. Lucchesi, V. Rosal, E. Podnar, M. Pozzi, M. Ciabattini, D. Quagliata, A. Capelli, G. Lacchio, L. Franchetti, M. C. Lovisetto, P. Petroni, Martina Bianchini, Valerio Vigoni, Jorge Rodríguez Chinchilla, M. Pérez-Castillo, A. S. Rubio, A. Muccioli, T. de Ponti, F. Palmieri, B. Laguna, E. Luna, G. Pazzagli, L. Longanesi, M. Fullop (proyecto project team); E. L. Ariza (directora de obra construction management)

ConsultoresConsultants
EIS Guia Consultores (estructura structure); J.G. Ingenieros (instalaciones MEP services); F. Amores (arqueología archaeology); I. González Ruiz (CSS safety coordinator); Higini Arau (acústica acoustics); Tratamiento de Conservación y Restauración (restauración restoration); Gmetal, EVC (maquetas models)

SuperficieArea
12.607,80 m²

PresupuestoBudget
10.664.216 euros (PEM adjudicado allocated MEB)