Campus Moos Secondary School, Kilchberg-Rüschlikon
E2A 

Campus Moos Secondary School, Kilchberg-Rüschlikon

E2A 


With its massive walls of unfaced reinforced concrete and its subtly composed windows, the building rises on an exact 25x25-meter footprint in order to leave the preexisting trees as they are.
[+][+]

Cliente Client
Zweckverband Sekundarschule 

Arquitectos Architects
E2A / Piet Eckert, Wim Eckert (socios partners); Nils Döring, Eric Rudolph, Oke Hauser, Andrea Kovács, Kirstyn Lindsay, Valentino Sandri, Tobias Weise (equipo team)

Consultores Consultants
Caretta Weidmann Baumanagement (gestión de construcción construction management); Dr. Lüchinger + Meyer Bauingenieure (estructura structure); Buri, Müller + Partner (fachada facade); Raderschallpartnert  (paisajismo landscape); Todt Gmür + Partner (instalaciones mechanical engineering); Neukom Engineering (fontanería plumbing); R+B Engineering (electricidad electrical); Neukom Engineering (fontanería plumbing); BB&A Buri Bauphysik & Akustik (sostenibilidad y acústica building physics and acoustics); Gruner + Wepf Ingenieure  (seguridad contra incendios fire safety) 

Superficie Floor area
5.285 m²

Presupuesto Budget
21.300.000 €

Fotos Photos
Rasmus Nolander; Jon Naiman (maqueta model)