Energy Dome, Soria (in construction)
Mansilla + Tuñón 


In the year 2008, the Madrid-based studio Mansilla + Tuñón won the international competition to build the first of the domes included in the Regional Plan for the Duero Valley: the main building of the Institutional Campus of Eco-City Soria, in Soto de Garray. The building is designed with the intention of qualifying a series of natural spaces and the area of the new city surrounding it, accommodating a program that promotes sustainable development. Almost half of the initial investment of 100 million euros has been used up to now. In April 2013 the construction was halted, aiming to give priority to the industrial sector of the new urban development...[+]


Cliente Client 
Junta de Castilla y León, SOMACYL 

Arquitectos Architects
Luis M. Mansilla, Emilio Tuñón, Carlos M. de Albornoz 

Colaboradores Collaborators
Marceline Ruckstuhl, Andrés Regueiro, Carlos Brage, Rubén Arend, Nuria Martínez Salas, Elke Gmyrek, Sara Murado, David Orkand, Rosa Bandeirinha Constructora Construction company Vias-Zarzuela 

Colaboradores en la construcción Construction company collaborators 
Terratest (pilotes de hinca prefabricados reinforced prefabricated piles), Del Pino y Mateo (suministro de hormigón concrete supply), San Miguel S.L., Construcciones Alto da Chiara S.L. (estructura de hormigón reinforced concrete structure), Escofet 1886 S.A. (prefabricados de fachada facade precasts), Prefabricados Olvega S.L. (prefabricados de cubierta esférica spheric roof precasts) 

Fotos Photos
Luis Argüelles, Tomás Miñambres —DespacioFotografía—