Campus WPP La Matriz, Madrid
b720 Fermín Vázquez Arquitectos- Type Headquarters / office Commercial / Office Refurbishment
- Material Glass
- Date 2016 - 2019
- City Madrid
- Country Spain
- Photographer Marc Goodwin
As part of a sensitive programme of urban regeneration, the project refurbishes and adapts the emblematic Telefónica building, in the center of Madrid. The intervention covers everything from the reconfiguration of interior spaces, circulation cores, accesses, and services to the complete reconstruction of the envelope. Cutting-edge energy efficiency and reduction of environmental impact go hand in hand with the optimum use of a spectacular interior with ceiling heights of more than five meters, affording effective, adaptable, open, and inspiring working environments and prioritizing the comfort of users as part of a flexible and sustainable office culture.
The imposing 133-meter main facade radically transforms the old building, formerly blind and impervious to any urban relationship and now transformed by a new glazed front whose curtain wall of aluminum and wood animates the street with the transparency of the activity inside and modulates relations with the neighboring buildings through the rhythm of its composition and reflections. The chestnut veneer elements inside the facade are also visible from the outside, contrasting with the existing rough concrete structure and framing the urban views from the workspaces...[+]
Cliente Client
WPP
Arquitectos Architects
b720 Fermín Vázquez
en colaboración con in collaboration with
BDG architecture+design
Equipo Team
Álvaro Alonso, Pedro Baltar, Carlos Beizaga, Enrique Diez, Sara García, Gustavo Gaudeoso, Laura Martín, Ana Murcia, Javier Pose, Antonio Riocerezo, David Torres
Colaborador Collaborator
BDG architecture + design
Estructura Structure
BAC Engineering Consultancy Group
Instalaciones MEP engineering
Hoare Lea + FSL
Superficie Floor area
32.000m²
Presupuesto Budget
60.000.000€
Fotos Photos
Marc Goodwin